34.9 miles

Craft limits

Longest boat

16.76m

Widest boat

2.59m

Deepest draught

0.75m

Tightest of 1 section on the Trust's “Monmouthshire & Brecon Canal” table

Notices in force

advisory

Monmouthshire and Brecon Canal: Solomon’s Bridge No 47 → Jockey Bridge No 55

We would like to advise our customers that we have had to close the stretch of canal between Bridge 47 and Bridge 55 due to a bed valve failure, which has resulted in a small leak within the canal bed. Contractors have carried out temporary repair works; however, the permanent repair will be undertaken during the winter maintenance programme. We apologise for any inconvenience this may cause and thank you for your cooperation and understanding.

Navigation closed

Monmouthshire and Brecon Canal: Lower Wern Bridge No 57 → Mortimer's Bridge No 65

A navigation closure is required to carry out investigation works to the channel and clay repairs to the canal

Navigation closed

Monmouthshire and Brecon Canal: Auckland Bridge No 104 → Dark Bridge No 109

A navigation closure is required to carry out investigation works to the channel and repair works to the concrete lining

Navigation closed

Monmouthshire and Brecon Canal: Workhouse Bridge No 118 → Dyfnant Bridge No 125

A navigational closure is required to facilitate channel investigation and concrete lining repairs.

Navigation closed

Monmouthshire and Brecon Canal: Depot Lock No 65

A navigation closure is required to facilitate replacement of the bottom gate and refurbishment of the top gate at Lock 65. Please note that these works have been added to the winter programme following publication of the original programme, allowing these improvements to be delivered this winter. The works will help maintain the safe and reliable operation of the lock.

Navigation closed

Monmouthshire and Brecon Canal: Brynich Lock No 69

A navigation closure is required to facilitate replacement of the bottom gate and refurbishment of the top gate at Lock 69. Please note that these works have been added to the winter programme following publication of the original programme, allowing these improvements to be delivered this winter. The works will help maintain the safe and reliable operation of the lock.