advisory
Leeds and Liverpool Canal: Gillibrand Bridge No 40
Update : November 20 2026, 4:18 PM Since our previous update, contractors have successfully removed the original tree that was blocking navigation. However, a further tree has since fallen near Bridge 40 on the Leeds & Liverpool Canal, causing an obstruction to both the navigation and the towpath, and both are currently closed. Our contractors have been notified and instructed to reattend the site as a priority to clear the obstruction. We will continue to monitor the situation and provide a further update on or before Wednesday 25 November. Update : November 17 2026, 3:42 PM Following our previous update, navigation remains closed at Bridge 40 on the Leeds & Liverpool Canal due to a fallen tree. Contractors are scheduled to attend the site later this week to remove the tree. A further update will be provided on or before Friday, 20 November. Update : November 13 2026, 4:20 PM Following our last update, navigation remains closed at Bridge 40 on the Leeds & Liverpool Canal due to a fallen tree. Our contractors continue to manage a high volume of work across the network following Storm Boelo. We are awaiting confirmation of when they will attend the site. A further update will be provided on or before Tuesday, 17 November.
Navigation closed
Leeds and Liverpool Canal: Five Rise Locks Swing Bridge No 200 → Kirkstall Forge Staircase Locks Nos 8 to 10
Update : November 4 2026, 9:59 AM Updated section: There is a Winter Stoppage on Newlay Flight from 02/11/2026 to 18/12/2026 Winter Stoppage for Newlay flight There will be no passages available through Kirkstall, Forge and Newlay from these dates. Passage will be available from the 19th December on the designated days of the week that passage would usually booked on. Winter opening times 1 November 2026 to 31 March 2027 Through the 2026/2027 winter season, passage can be booked through Bingley Three & Five Rises and Kirkstall to Newlay Locks, with a minimum of 72 hours' notice. To make a booking, please sign in to the online licensing pages and click on 'my boats.' Follow the link the 'bookings' section. https://licensing.canalrivertrust.org.uk/ To help us manage boats and water resources efficiently, we are asking customers to plan their passages using the following information. First passage is available from 9am and the last passage is 1pm daily. Following the last daily passage these locks will be locked up. Christmas & New Year: The Locks will be closed to passage on the 25 & 26 December 2026 and 1st January 2027 Original : October 16 2026, 4:10 PM Winter opening times 1 November 2026 to 31 March 2027 Through the 2026/2027 winter season, passage can be booked through Bingley Three & Five Rises and Kirkstall to Newlay Locks, with a minimum of 72 hours' notice. To make a booking, please sign in to the online licensing pages and click on 'my boats.' Follow the link the 'bookings' section. https://licensing.canalrivertrust.org.uk/ To help us manage boats and water resources efficiently, we are asking customers to plan their passages using the following information. First passage is available from 9am and the last passage is 1pm daily. Following the last daily passage these locks will be locked up. Christmas & New Year: The Locks will be closed to passage on the 25 & 26 December 2026 and 1st January 2027
Navigation closed
Leeds and Liverpool Canal: Tin Footbridge No 179C
A navigation and towpath closure is required for replacement of the footbridge by North Yorkshire County Council.
Navigation closed
Leeds and Liverpool Canal: Newlay Staircase Locks Nos 11 to 13
A navigation closure is required to carry out repair works to the top and bottom gates and other essential works
advisory
Leeds and Liverpool Canal: Wigan Bottom Lock No 85 → Wigan Top Lock Services
Update : September 11 2026, 12:15 PM Unfortunately we've had to reschedule these works into the New Year as a result of working through design changes and needing to secure listed building consent for these changes. The works are now planned to take place between 25 January 2027 and 10 February 2027. We apologise for any inconvenience and thank you for your patience.
advisory
Leeds and Liverpool Canal: Wigan Bottom Lock No 85 → Wigan Top Lock No 65
Update : September 11 2026, 12:13 PM Unfortunately we've had to reschedule these works into the New Year as a result of working through design changes and needing to secure listed building consent for these changes. The works are now planned to take place between 10 February 2027 and 26 February 2027. We apologise for any inconvenience and thank you for your patience.
Navigation closed
Leeds and Liverpool Canal: Tarleton Lock
A navigation closure is required to allow the top lock gates to be replaced and to carry out works to address water leakage on the bottom gates. During the works, towpath users may experience short delays. Please follow any on‑site signage and instructions.
Navigation closed
Leeds and Liverpool Canal: Chicken Lock No 6 → Rufford Lock No 7
Update : October 8 2026, 8:20 AM Following a review of the planned works, the programme has been revised and the works are now expected to be completed earlier than originally planned. The works will commence on 4 January, as previously advertised, and are now scheduled to be completed by 29 January. The navigation will remain closed for the duration of these works. We apologise for any inconvenience and thank you for your patience and understanding. Original : April 28 2026, 12:17 PM A navigation closure is required to carry out works to reduce water leakage through the lock gates and to repair the chamber walls. During the works, towpath users may experience small delays. Please follow any on‑site signage and instructions.
Navigation closed
Leeds and Liverpool Canal: Lathom Locks No 1 Swing Bridge
A navigation closure is required to carry out grouting works to the lock
Navigation closed
Leeds and Liverpool Canal: Mann Island Basin
A navigation closure is required to carry out repairs to the bottom gate
advisory
Leeds and Liverpool Canal: Wigan Dry Dock Lock No 87 → Wigan Junction
Update : October 8 2026, 8:18 AM Following a review of the planned works, the programme has been revised and the works will now take place between 4 January and 19 February. The navigation will remain closed for the duration of these works. We apologise for any inconvenience and thank you for your patience and understanding. Original : June 23 2026, 11:44 AM A navigation and towpath closure are required to facilitate lock gate repairs to Lock 87 bottom gate. Towpath users may experience small delays.
Navigation closed
Leeds and Liverpool Canal: Dean Locks No 90
A navigation closure is required to carry out grouting works to the lock
advisory
Leeds and Liverpool Canal: Barrowford Bottom Lock No 51 → Barrowford Top Lock No 45
Update : November 10 2026, 3:57 PM Since our last update we have had confirmation that the delivery of the anchor plate is anticipated in the next 2 weeks and once received the team will begin the repairs to reattach the lock gate. A further update will be provided on or before Tuesday 24 November Update : October 27 2026, 3:00 PM Since our previous update, all required consultations with the Heritage and Ecology teams have been completed. However, there has been a delay in the delivery of the new anchor plate required to reattach the lock gate. As a result, works cannot progress as planned until anchor plate has been received. A further update will be provided on or before Tuesday 10 November. Update : October 7 2026, 10:49 AM Since our last update, engineers have attended site to inspect Lock 46 following a boating incident. Unfortunately, the lock gate has detached from its fixing. Repairs will involve replacing the anchor plate that has been pulled from the coping stone and reattaching the lock gate on the offside. The works are expected to be completed within the next two to three weeks. During this period, a detailed repair plan will be developed, the required materials will be ordered, and consultations will take place with our Heritage and Ecology teams to ensure the works can proceed appropriately. A further update will be provided on or before Wednesday 28 October.
Navigation closed
Leeds and Liverpool Canal: Hirst Mill Swing Bridge No 207 → Hirst Lock Footbridge
A navigation closure is required to carry out repair works to the top and bottom gates, by-wash and lock chamber
Navigation closed
Leeds and Liverpool Canal: Barrowford Bottom Lock No 51 → Barrowford Lock No 48
A navigation closure is required to carry out repair works to the Lock 51 tailgate, the towpath will remain open but towpath users may experience small delays