Checking notices…Navigation notices
Back to the planner

Shropshire Union Canal

West Midlands & Wales · 66.7 miles

The Shroppie: Nantwich, Chester and the Llangollen branch over the Pontcysyllte Aqueduct.

On the map

The waterwayPlaces along it

Craft limits

Longest boat

21.95m

Widest boat

2.13m

Deepest draught

1.1m

Tightest of 5 sections on the Trust's “Shropshire Union Canal” table

Notices in force

Navigation closed

Shropshire Union Canal: Beeston Iron Lock No 34 → Tilstone Lock No 32

A navigation closure is required to allow essential repairs to be carried out to the lock gates at both the top and bottom of the lock. Repairs will also be carried out to the paddle mechanism.

advisory

Shropshire Union Canal: Grindley Brook Bottom Lock No 14 → Whitchurch Ring Road Bridge No 31A

Update : November 3 2026, 11:49 AM We are pleased to advise that good progress continues to be made on the major reconstruction works following the breach on the Llangollen Canal near Whitchurch. Following completion of the ground investigations, engineering surveys and detailed design, work to rebuild the embankment is now well underway. We currently expect the canal to reopen in March 2027, ahead of Easter and the start of the main boating season. The embankment rebuild is expected to be completed before Christmas, after which a concrete base will be laid and construction of the new canal channel will begin. As with all major construction projects, progress remains dependent on weather conditions. We will continue to provide updates as the works progress and will confirm the reopening date when we are able to do so. Update : October 21 2026, 9:10 AM Repair works continue at the breach site. The canal dams will remain in place for the foreseeable future while repair works continue. Retaining the dams will support the ongoing programme of works and enable the remaining repairs to be completed as efficiently as possible. We will continue to provide updates as further information becomes available. Update : September 30 2026, 12:56 PM Reconstruction works on the canal embankment have now recommenced. Following further assessment of ground conditions, areas of soft material within the existing embankment are being removed and replaced with compacted granular fill. In addition, the embankment design has been enhanced through the introduction of a Mechanically Stabilised Layer within the lower section of the new embankment, providing additional strength and resilience. The canal dams recently relocated to the southern end of the embankment will remain in place for the duration of the works. We will continue to provide updates as the project progresses and thank customers for their continued patience and understanding.

restriction

Shropshire Union Canal: Swanley Lock No 6 → Baddiley Lock No 9

Update : November 12 2026, 4:50 PM Following our previous update, the ground conditions at the site have improved enough for us to provide a one off assisted passages, giving an opportunity for boats currently affected by the closure. The assisted passages will be available daily from 28 November to 2 December 2026 The following passages which will be available each day at the following times: * 10:00 am – Passage either towards Wrenbury or down towards the Shropshire Union Canal. * 11:00 am – Passage either towards Wrenbury or down towards the Shropshire Union Canal. Customers wishing to take advantage of this opportunity and book a passage in either direction should contact our North West Customer Support Team on 0303 040 4040. These passages will be available for boats travelling down towards the Shropshire Union Canal and up towards Whitchurch. Our team will continue to closely monitor conditions on site and will review these operating times regularly, making adjustments where possible. However, as conditions remain heavily dependent on the weather, we encourage customers to be prepared for the possibility of further restrictions or closures should we experience additional periods of adverse weather. Customers booking these passages should arrive in good time and follow any instructions provided by staff on site. We would like to thank customers for their continued patience and understanding while we work towards completing the permanent repair works. Further updates regarding the permanent repair programme will be provided as more information becomes available. A further update will be provided on or before 4 December. Update : November 6 2026, 2:52 PM Following our previous update, the recent wet weather has unfortunately led to increasingly challenging ground conditions at the site. To make sure the repairs can be completed safely, we have had to review and adjust our approach to the permanent repair works. At present, works for the permanent repairs is plann

advisory

Shropshire Union Canal: Wrenbury Lift Bridge No 20

Update : November 17 2026, 3:53 PM Since our last update, we have received confirmation that our contractor will be on site on Monday 23 November from 7:30am until 5:00pm on Friday 27 November to dismantle the bridge structure. To allow these works to be completed as efficiently and safely as possible, the bridge will need to be closed to pedestrians while contractors are undertaking the necessary works. Due to the condition, stability and safety requirements of the structure while it is in this state of repair, it will not be possible to allow pedestrians to cross the bridge until works have been completed. Update : November 5 2026, 2:51 PM Since our last update, we have now received approval from Historic England and we await confirmation of a start date for repairs from our contractor. The planned works will involve dismantling the bridge superstructure, making the site safe, and transporting the timber sections to our yard at Preston Brook, where they will be stored until they can be rebuilt. Once these details have been agreed and a start date has been scheduled, we will provide further information. A further update will be provided on or before Thursday, 19 November. Update : October 22 2026, 2:54 PM Since our last update, a specialist contractor has now been appointed. Once a start date for the repairs has been scheduled, we will provide further information regarding timescales for the works. A further update will be provided on or before Thursday 5 November.

Navigation closed

Shropshire Union Canal: Grindley Brook Top Lock No 16 → New Mills Lift Bridge No 31

A navigation and towpath closure is required to carry out repair works to brickwork and replacement of the bye-pass grill

Navigation closed

Shropshire Union Canal: Burland Bridge No 6 → Swanley Lock No 6

Update : November 20 2026, 1:49 PM Further to our previous update, repairs to the wing wall at Swanley Lock 2 are continuing. Recent weather conditions have affected the time required for the brickwork and mortar to cure, meaning the works are taking longer than originally anticipated. To allow the repairs to be completed to the required standard and ensure the long-term stability of the structure, the closure will now remain in place until 27 November. We apologise for any inconvenience this may cause and thank you for your patience and understanding while we complete these essential repairs. Original : October 8 2026, 8:14 AM A navigation closure is required to enable essential repairs to be carried out to both the head and tail gates at Swanley Lock 2. Swanley Bridge Marina remains open and accessible throughout the duration of the work. The works will include boarding of the gates, mitre repairs, quoin post repairs and cill repairs to address water loss through the lock. These repairs are required to improve the operation of the lock, reduce water loss and maintain safe navigation through the flight. We apologise for any inconvenience this may cause and thank you for your patience and understanding while we complete these essential repairs.

advisory

Shropshire Union Canal: Morris Lift Bridge No 45

Update : November 20 2026, 2:51 PM A replacement chain is being sourced and the navigation remains closed until the lift bridge is repaired. We thank you for your understanding and apologise for any inconvenience this may cause. We will update with any further information as soon as we receive it. Update : November 12 2026, 9:55 AM Navigation remains closed and there is no change to the position at present. We are awaiting details of when repair works will be undertaken and will share further information as soon as available. Original : November 10 2026, 3:11 PM Please be aware that there is a problem with the Bridge 45, Morris' Lift Bridge. Both the road that the bridge services and the navigation are now closed. The Mechanical and Electrical team are mobilising to get someone there today. We will update Notice as soon as further information is available.

advisory

Shropshire Union Canal: Hampton Bank Bridge No 50 → Hampton Bank Winding Hole

Update : November 17 2026, 10:19 AM We are aware that water levels in the area are currently low. Our teams are monitoring the situation and are working on solutions to help manage water levels. Thank you for your continued patience while we work to resolve the situation. Update : November 16 2026, 3:53 PM We recognise that the closure of the Llangollen Canal at Hampton Bank Bridge will be causing significant concern and disruption for many boaters. We're particularly conscious that some of you may be unable to reach your home mooring, will have had travel plans disrupted, or are facing uncertainty about access to facilities and services. As you may be aware, the closure follows the failure of a culvert beneath the canal, which resulted in a breach. Our teams responded immediately to secure the site and prevent further water loss and are continuing to assess the damage and develop a repair plan. At this stage, we're not yet able to confirm how long the closure is likely to remain in place. We understand this uncertainty is difficult for those affected and we will provide further updates as soon as we have more information. For those of you between Bridges 51 and 45, facilities, including water, elsan and pump outs are available at Whixall Marina, and we would encourage you to make use of them. If you're experiencing difficulties because of the closure, please get in touch on 03030 404040. We're looking into what support may be available and want to understand the circumstances of those affected. We'll do our very best to help. We appreciate this is a difficult and uncertain time and thank you for your patience and understanding while we work as quickly and safely as possible to resolve the situation Update : November 13 2026, 11:39 AM Our team remain on site carrying out emergency works to slow the flow of water into a neighbouring field. Please note that the towpath is also closed. Investigations are still underway to establish the possible cause of the collapse, a

advisory

Shropshire Union Canal: Hurleston Top Lock No 4 → Hurleston Bottom Lock No 1

Update : November 20 2026, 3:11 PM Since our last update, our local team has continued to closely monitor water levels following the breach at Culvert 51, between Bridge 50 and Bridge 53 on the Llangollen Canal. Water levels have continued to remain stable, however, they have not yet recovered sufficiently to allow navigation to resume. To enable the safe management of water levels and protect the water supply feeding Hurleston Reservoir, Hurleston Lock Flight will remain closed until further notice. Further information about the breach, including the latest updates, can be found here . A further update will be provided on or before, Friday 27 November. Update : November 16 2026, 11:14 AM Since our last update, our local team has continued to closely monitor water levels over the weekend following the breach at Culvert 51, between Bridge 50 and Bridge 53 on the Llangollen Canal. Whilst water levels have remained stable over the weekend, they have not increased sufficiently to allow navigation to resume. To protect the water supply feeding into Hurleston Reservoir and enable the continued safe management of water levels, Hurleston Lock Flight will remain closed until further notice. Further information about the breach, including the latest updates, can be found here . A further update will be provided on or before Friday, 20 November. Original : November 13 2026, 2:36 PM Following a breach that occurred yesterday at Culvert 51, between Bridge 50 and Bridge 53 on the Llangollen Canal, Hurleston Lock Flight has been closed until further notice. This temporary closure is necessary to enable our teams to safely manage and stabilise water levels. The breach has impacted the water supply to this section of canal, and restricting boat movements is essential to help conserve water. Further information about the breach, including the latest updates, can be found here . A further update will be provided on or before Monday, 16 November.

advisory

Shropshire Union Canal: Bank Lock No 12 → Byles Lock No 22

Update : July 10 2026, 12:27 PM Please be advised that the water levels have returned to operational levels. Welshpool Lock will be unlocked this afternoon, but Belan and Pool Quay Locks will remain locked and sealed to maintain the filling of pounds until further notice. Passage will be supported by local teams as required. We apologise for any inconvenience and thank you for your patience. Original : July 1 2026, 7:50 AM Following a recent drop in water levels on the Montgomery Canal, we are taking action to restore levels to normal as quickly as possible. To safeguard water resources , all lock use between Byles Lock and Bank Lock is suspended until further notice. New fish screens have recently been installed at the Penarth feeder to comply with Natural Resources Wales regulations. While the works temporarily affected water levels, a combination of dry weather and low river levels before installation also contributed to the current situation. We are clearing the new screens daily and have temporarily closed locks on the canal. An unauthorised water transfer through locks upstream of Welshpool unfortunately significantly reduced water levels further, increasing the risk of damage to the canal. The locks will remain closed while levels recover. As part of the fish screen works, a recent dredging programme has improved water abstraction at the feeder, which will help support water levels in the canal over the longer term. Subject to weather conditions and any ongoing drought impacts, we expect water levels to return to normal within the next two weeks. We apologise for the temporary impact on navigation, but these measures are necessary to protect the canal while recovery takes place. We will continue to provide updates and look forward to reopening the locks.

advisory

Shropshire Union Canal: Rhoswiel Bridge No 18W → Gledrid Bridge No 19W

The Roving Canal Traders Association "Poachers" Christmas Floating Market will be taking place from Saturday 5th to Sunday 6th December 2026 on the Llangollen Canal. The event will be starting at 10:00am and finishing at 5:00pm each day. This will take place between Bridge 18W, Rhosweil Bridge and Bridge 19W, Gledrid Bridge. The Poacher's Pocket Visitor Mooring will be suspended for the event from Thursday 3rd December 2026, 9:30am to Monday 7th December 2026, 12:00pm. The moorings will be signposted. You can see more details about this event here: Roving Canal Traders Association

advisory

Shropshire Union Canal: Wheaton Aston Services

The pump out only is out of order, please bear with us whilst we get this looked into. We'll update further once more is known.

restriction

Shropshire Union Canal: Frankton Staircase Lock No 1 → Frankton Bottom Lock No 3

Please be advised that winter opening arrangements at Frankton Locks will apply from Monday 2 November 2026 until Monday 15 March 2027. During this period, the locks will be open: * Monday, Wednesday, Friday and Saturday * 9:00am to 1:00pm You can book online - Book your passage online here All winter passages must be booked at least 48 hours in advance. Bookings cannot be accepted on the day of passage. A maximum of 12 boats travelling down the locks and 12 boats travelling up the locks will be permitted each day. When booking, boaters must also provide a date for their return passage. Stays must be for a minimum of one night and a maximum of 14 nights. Christmas and New Year closures Frankton Locks will be closed on: * Friday 25 December 2026, Christmas Day * Saturday 26 December 2026, Boxing Day * Friday 1 January 2027, New Year's Day We kindly ask boaters to plan their journeys accordingly.

Navigation closed

Shropshire Union Canal: Audlem Bridge No 78 → Audlem Top Lock No 13

A navigation closure is required to allow essential repairs to the lock gates at both the top and bottom of the lock. To carry out the work safely and effectively, the entire flight will be closed so that water levels can be controlled and the works are not flooded while repairs are underway.

Navigation closed

Shropshire Union Canal: Audlem Lock No 19 → Audlem Lock No 25

A navigational closure is required to facilitate replacement of the top lock gate on Lock 13 of the Audlem lock flight. We will also be relining the mitre on the bottom gates and doing various brick repairs. We will be closing from locks 7 to 13 for water control reasons.

Navigation closed

Shropshire Union Canal: Nantwich Junction Bridge No 92 → Nantwich Aqueduct

Update : November 6 2026, 4:19 PM Since this stoppage was first advertised, further investigations have identified a larger scope of work than originally anticipated. This closure will now be used to dewater the canal and undertake detailed inspections of the wash walls between Culvert 49 and Nantwich Aqueduct, helping us determine the extent of repairs required and plan future works accordingly. These investigations are required to establish the full condition of the wash walls and inform the scope of any repair works that may be needed. Any repairs identified as a result of these inspections will be planned and carried out during a future stoppage. During this period, navigation will remain closed through the affected section. We apologise for any inconvenience this may cause and thank you for your patience and understanding. Original : June 23 2026, 12:40 PM A navigation and towpath closure are required to facilitate the removal of Culvert 49 and installation of a new pipe. We will also be reconstructing part of the embankment at this location and reinstating the canal bed. The navigation will be closed from Bridge 92, Nantwich Junction Bridge through to the Nantwich Aqueduct.

Navigation closed

Shropshire Union Canal: Autherley Stop Lock

A navigation and towpath closure is required to carry out replacement of the top gate

Places along the waterway(179)

  • Redgate

    Village

  • Guilsfield Branch Limit

    Village

  • Guilsfield Branch

    Village

  • Guilsfield Branch Junction

    Junction

  • Gallowstree Bridge Tunnel (western portal)

    Village

  • Welshpool Wharf

    Village

  • Freestone Lock

    Junction

  • Wide Water Wharf

    Village

  • The Nags Head Inn

    Village

  • Gallowstree Bridge Tunnel (eastern portal)

    Village

  • Y Llanfa

    Village

  • Site of Route to Original Whitehouse Bridge

    Village

  • Aberbechan

    Town

  • Heulwen Wharf

    Village

  • Buttington Wharf

    Village

  • Pennant Dingle

    Village

  • Ellesmere Port Ship Basin

    Village

  • Trevor Basin

    Junction

  • The Telford Inn

    Village

  • The Old Wharf

    Village

  • Ruabon Branch Junction

    Junction

  • Junction of Plas Kynaston Canal (closed)

    Village

  • C&RT Information Point (Trevor)

    Village

  • Llanymynech Wharf

    Village

  • Wern Wharf West Arm

    Village

  • Wern Eastern Arm

    Village

  • Lubb Street Wharf

    Junction

  • Humber Branch Junction

    Junction

  • Barbridge Junction

    Junction

  • Rednal Basin

    Village

  • Green Wicket Corner

    Village

  • Frankton Junction

    Junction

  • The Olde Barbridge Inn

    Village

  • Barbridge Services

    Village

  • Site of Jolly Tar PH

    Village

  • Shrewsbury Canal Terminal Warehouse

    Junction

  • Roddington Wharf

    Village

  • Trench Lock Interchange

    Junction

  • Berwick Tunnel (eastern entrance)

    Village

  • Shrewsbury Basin

    Village

  • Gronwyn Wharf

    Village

  • Nantwich Basin Narrows

    Village

  • Nantwich & Border Counties Yacht Club (nbcyc)

    Village

  • Wardle Service Station & Country Store

    Village

  • The Navigation Inn (Maesbury)

    Village

  • Nantwich Services

    Village

  • Maesbury Wharf

    Village

  • The Queen's Head PH (Montgomery Canal)

    Village

  • Henhull Bridge Winding Hole

    Village

  • Weston Arm Junction

    Junction

  • Hurleston Junction

    Junction

  • Barbridge Junction Stop Narrows

    Village

  • Mill Arm

    Village

  • Tattenhall Marina

    Village

  • Costa Coffee (Christleton)

    Village

  • Beeston Castle Wharf

    Village

  • Taylor's Boatyard

    Village

  • C&RT Water Point (Chester)

    Village

  • River Dee Branch Junction

    Junction

  • Bridge Inn (Chester)

    Village

  • Tower Wharf Warehouse Dock

    Village

  • The Lock Vault PH

    Village

  • Telford's Warehouse PH

    Village

  • C&RT Services (Chester)

    Village

  • Former Route to River Dee (Dee Branch)

    Village

  • Former Bunbury Stables

    Village

  • Taylor's Boatyard Drydock

    Village

  • Longwaste Wharf

    Village

  • Sundorne Wharf

    Village

  • Berwick Tunnel (western entrance)

    Village

  • Berwick Wharf

    Village

  • Bridge No 28 (S&NC)

    Village

  • Wappenshall Junction

    Junction

  • Factory Basin

    Village

  • Water Point (Christleton)

    Village

  • The Shady PH

    Village

  • Former Route to River Dee

    Village

  • Lock Keeper PH

    Village

  • Cheshire Cat PH

    Village

  • The Old Harkers Arms PH

    Village

  • Weston Arm Services (C&RT)

    Junction

  • Minshull Wharf

    Village

  • Sykes Hollow Leisure Area

    Village

  • Weaverbank Stables

    Village

  • Barbridge Marina

    Village

  • The Badger Inn

    Village

  • Ellesmere Services

    Village

  • Whixall Marina

    Junction

  • Ellesmere Branch Junction

    Junction

  • Ellesmere Town Wharf

    Junction

  • Ellesmere Warehouse

    Village

  • Whixall Moss Junction

    Junction

  • Ellesmere Port Upper Basin

    Junction

  • Craughton Wharf

    Village

  • The Boat Museum

    Village

  • Junction Inn

    Village

  • Old Lea Wharf

    Village

  • Woodseaves Cutting (northern end)

    Village

  • Pendeford Narrows

    Village

  • Norbury Junction Narrows

    Village

  • Tyrley Wharf Winding Hole

    Village

  • The Boat Inn (Gnosall)

    Village

  • Tyrley Wharf Services

    Village

  • Wolverhampton Boat Club

    Village

  • Knighton Wharf

    Town

  • Cowley Tunnel No 33 (southern entrance)

    Town

  • Cowley Tunnel No 33 (northern entrance)

    Town

  • The Navigation Inn (Gnosall)

    Village

  • Belvide Reservoir Feeder

    Village

  • The Hartley Arms PH

    Village

  • Norbury Junction

    Junction

  • Turner's Garage

    Village

  • The Wharf Tavern (Cheswardine)

    Village

  • Audlem Wharf

    Village

  • Shroppie Fly PH

    Village

  • Nantwich Marina Wharf

    Village

  • Pendeford Stop

    Village

  • Wheaton Aston Services

    Village

  • Norbury Junction Services

    Village

  • Tyrley Man

    Village

  • Norbury Stop Gates

    Village

  • Shebdon Embankment

    Village

  • Woodseaves Cutting (southern end)

    Village

  • Audlem Water Point (below Lock No 25)

    Village

  • Hall's Bridge Narrows No 87

    Village

  • Victoria Wharf (Market Drayton)

    Village

  • Bridge Inn (Audlem)

    Village

  • Site of Bridge No 81

    Village

  • Whitchurch Branch Junction

    Junction

  • Chemistry Bridge

    Junction

  • Pontcysyllte Aqueduct (southern end)

    Town

  • The Bridge Inn (Chirk)

    Village

  • C&RT Information Point (Llangollen)

    Village

  • Llantisilio - Horseshoe Falls

    Junction

  • Llangollen Services

    Village

  • Lyneal Wharf

    Village

  • Grindley Brook Water Points

    Village

  • Bettisfield Services

    Village

  • The Swan PH (Marbury)

    Village

  • Grindley Brook Lockside Café & Stores

    Village

  • England - Wales Border

    Village

  • Hurleston Services / Locks Waiting Area

    Village

  • Llangollen Wharf

    Town

  • Bryn Howel Hotel

    Village

  • The Jack Mytton Inn (closed)

    Village

  • Ellesmere Tunnel (western entrance)

    Village

  • Chirk Tunnel (southern entrance)

    Village

  • Chirk Tunnel (northern entrance)

    Town

  • Horseshoe Falls Valve House

    Village

  • The Chainbridge Hotel & Riverside Restaurant

    Village

  • Whittington Wharf Narrowboats

    Village

  • Llangollen Narrows Section (500m)

    Village

  • Llangollen Narrows Section (125m)

    Village

  • Whitehouses Tunnel (northern entrance)

    Village

  • The Sun Trevor PH & Restaurant

    Village

  • The Old Limekilns

    Village

  • Ellesmere Maintenance Yard

    Village

  • Aqueduct Inn

    Village

  • The Poachers Pocket PH

    Village

  • New Marton Water Points

    Village

  • Coedfryn Water Point

    Village

  • Whitehouses Tunnel (southern entrance)

    Village

  • Llangollen Pavilion

    Village

  • Chirk Aqueduct (northern end)

    Town

  • Llangollen Motor Museum

    Village

  • Llangollen Narrows Section (300m)

    Village

  • The Narrow Boat PH (Whittington)

    Village

  • Blackwater Meadow Marina

    Village

  • Bettisfield Boats

    Village

  • Grindley Brook Services

    Village

  • Grindley Brook Garage

    Village

  • Ellesmere Tunnel (eastern entrance)

    Village

  • Hurleston Services

    Village

  • Whitchurch Marina

    Village

  • Wales - England Border

    Village

  • Grindley Brook Pump-Out

    Village

  • Dusty Miller PH

    Village

  • Wappenshall Wharf

    Village

  • Edgmond Wharf

    Village